📞 Free site visit + itemised quote — WhatsApp: +233 560 968 224
HomeResidential CommercialRenovation Get a Quote
Home›Concrete Contractors
Cornerstone Build Ghana · Accra Concrete Works

Concrete contractors in Accra — correct mix, correct curing, no shortcuts

Cornerstone Build Ghana handles all structural concrete — foundations, columns, beams, ground slabs, and suspended slabs. Specified to engineer's drawings, cured correctly, never rushed.

Also: concrete contractors near me accra · cement contractors accra · foundation concrete ghana · concrete work accra · slab contractors ghana

Concrete works we carry out in Accra

⬇️

Strip Foundations

Reinforced concrete strip foundations to structural engineer's specification. 42.5N cement as standard. Correct depth confirmed by soil investigation.

🔲

Raft Foundations

Required for waterlogged or variable soil — Kasoa, Spintex wetland edge, low-lying Tema plots. Reinforced concrete raft to structural drawings.

🏗️

Ground Floor Slab

150mm reinforced concrete slab on hardcore. Includes DPC and anti-termite treatment as standard. Minimum 21-day cure before loading.

🏢

Suspended Slab

First and upper floor slabs. Formwork, reinforcement to structural drawings, concrete pour, minimum 21-day cure before striking formwork.

📏

Columns and Beams

Reinforced concrete columns and beams. Steel bending and fixing to structural engineer's bar schedule. Concrete placed and vibrated correctly.

🛣️

Driveways and Paths

150mm reinforced concrete driveway slabs, external walkways, and hardstanding areas.

Concrete WorkQ2 2026 Cost (GHS)Notes
Strip foundation concrete (3-bed)GHS 38,000–65,000Materials + labour. Stable laterite soil
Raft foundation (3-bed)GHS 55,000–95,000Waterlogged or variable soil conditions
Ground floor slab (per m²)GHS 280–420/m²150mm RC including mesh reinforcement
Suspended slab (per m²)GHS 380–600/m²Including formwork, rebar, concrete, strike
Concrete driveway (per m²)GHS 220–380/m²150mm slab. Mesh reinforced
Column casting (per linear metre)GHS 380–620/m225×225mm RC column. Labour + materials
Never accept 32.5N cement in structural concrete. Substituting 32.5N for the specified 42.5N in foundations, columns, and slabs reduces structural capacity. All Cornerstone structural concrete uses 42.5N cement — specified in writing in your contract.

Concrete Contractors Accra questions answered

How much does concrete work cost in Accra?

Concrete slab (150mm RC) costs GHS 380–600 per m² installed in 2026. A ground floor slab for a 3-bedroom house (110–140m²) typically costs GHS 42,000–84,000. Foundation concrete for a strip foundation: GHS 38,000–65,000. Always specify 42.5N cement for structural concrete.

What concrete mix is used for house foundations in Ghana?

Structural concrete in Ghana should use 42.5N Portland cement (not 32.5N), clean river sand, 3/4" crushed granite chippings, and clean water. A typical structural mix is 1:2:4 (cement:sand:aggregate) giving approximately 25MPa strength at 28 days. Never substitute 32.5N cement for structural elements.

How long does concrete need to cure before building on it?

Structural concrete needs a minimum of 21 days to cure before formwork is struck or significant load is applied. Rushing this process weakens the final structural capacity, regardless of how solid it appears on the surface.

Can concrete work start immediately, or do I need a soil test first?

For foundation concrete, a soil investigation should be completed first — it determines the correct foundation type and depth. Skipping this step is one of the most expensive mistakes in Ghana construction.

Get a free, itemised quote today

Free site visit within 48 hours. Fixed-price contract before any deposit. 6-month workmanship warranty.

Request My Free Quote 💬 WhatsApp Kwaku
💬
📞 Call 💬 WhatsApp